WSDOT unit bid prices and bid tabulations
Unit prices bid on 1,317 Washington State DOT contracts let from 29 DEC 1999 to 07 OCT 2026, read from WSDOT's own tabulations. 167 pay items have enough recent bids for a page of their own; every item is in the explorer.
- Contracts
- 1,317
- Bids
- 5,732
- Unit prices
- 365,366
Data through 07 OCT 2026, the latest WSDOT letting read. Compiled by Mirage Metrics.
Price a WSDOT pay item
Pay items bid most often in Washington
| Pay item | Code | Unit | Low-bid median | Low bids |
|---|---|---|---|---|
| Erosion and sediment control lead | DAY | $100.00 | 1 | |
| Paint line | LF | $0.78 | 4 | |
| Construction signs class A | SF | $32.50 | 6 | |
| Flexible guide post | EACH | $110.00 | 3 | |
| Crushed surfacing base course | TON | $58.00 | 6 | |
| Planing bituminous pavement | SY | $5.97 | 2 | |
| Roadway excavation including haul | CY | $30.50 | 4 | |
| Inlet protection | EACH | $122.50 | 2 | |
| Plastic traffic arrow | EACH | $340.50 | 2 | |
| High visibility fence | LF | $8.00 | 3 | |
| Plastic drainage marking | EACH | $68.00 | 1 | |
| Plastic stop line | LF | $72.00 | 1 |
Check my bid
Add the lines you are pricing, with your quantity and unit price. Each line is placed against what bidders carried in the last 24 months, at a similar quantity when enough bids exist. Your numbers stay in this browser.
Competitors
Who bids, how often they are low, how far off they are when they lose, and how much they leave on the table when they win.
Sort by: most bids counts every bid a firm submitted; most low bids counts the contracts where it was the low bidder; win rate is low bids divided by bids, for firms with five bids or more; low bid volume adds up its low bids in dollars. Gap when not low is the average distance from its total to the low bid; left on table is the average distance from its low bid to the second bid.
618 firms in Washington, the 50 with the most bids shown.
| Bidder | Bids | Low bids | Win rate | Gap when not low | Left on table | Low bid volume |
|---|---|---|---|---|---|---|
| Granite Construction Company | 267 | 60 | 22% | +22% | +11% | $185.5M |
| Lakeside Industries, Inc. | 164 | 60 | 37% | +19% | +13% | $137.7M |
| Wilder Construction Company | 120 | 25 | 21% | +16% | +10% | $40.5M |
| Scarsella Bros., Inc. | 115 | 30 | 26% | +13% | +5.0% | $215.4M |
| Tri-State Construction, Inc. | 94 | 30 | 32% | +14% | +9.0% | $170.1M |
| Interwest Construction, Inc. | 81 | 23 | 28% | +16% | +9.0% | $72.0M |
| C.A. Carey Corporation | 79 | 7 | 9% | +21% | +28% | $32.4M |
| Quigg Bros., Inc. | 78 | 12 | 15% | +26% | +8.0% | $39.4M |
| Tucci & Sons, Inc. | 75 | 33 | 44% | +16% | +10% | $77.5M |
| Mowat Construction Company | 74 | 20 | 27% | +16% | +5.0% | $123.6M |
| Poe Asphalt Paving, Inc. | 71 | 21 | 30% | +13% | +6.0% | $52.4M |
| Central Washington Asphalt, In | 70 | 40 | 57% | +13% | +10% | $189.1M |
| Strider Construction Co., Inc. | 69 | 14 | 20% | +19% | +14% | $31.9M |
| Coral Construction Company | 63 | 13 | 21% | +31% | +10% | $11.2M |
| Central Washington Asphalt, I | 63 | 18 | 29% | +10% | +6.0% | $71.9M |
| Rognlin'S, Inc. | 62 | 10 | 16% | +31% | +12% | $38.5M |
| Columbia Asphalt & Gravel, Inc | 59 | 15 | 25% | +11% | +6.0% | $31.3M |
| Petersen Brothers, Inc. | 57 | 17 | 30% | +15% | +11% | $13.0M |
| N.A. Degerstrom, Inc. | 51 | 12 | 24% | +27% | +13% | $16.5M |
| Midmountain Contractors, Inc. | 48 | 10 | 21% | +24% | +8.0% | $91.3M |
| Totem Electric of Tacoma, Inc. | 48 | 11 | 23% | +26% | +11% | $4.7M |
| A-1 Landscaping and Constructi | 47 | 3 | 6% | +67% | +12% | $6.5M |
| Ceccanti, Inc. | 46 | 2 | 4% | +29% | +4.0% | $32.3M |
| Northeast Electric, LLC | 44 | 21 | 48% | +21% | +14% | $14.9M |
| Max J. Kuney Company | 43 | 10 | 23% | +13% | +5.0% | $285.5M |
| KLB Construction, Inc. | 42 | 9 | 21% | +13% | +5.0% | $52.1M |
| Dirt and Aggregate Interchange | 41 | 7 | 17% | +19% | +13% | $6.1M |
| Gary Merlino Construction Co., | 40 | 5 | 13% | +20% | +6.0% | $94.4M |
| Massana Construction, Inc. | 38 | 17 | 45% | +15% | +11% | $33.8M |
| Imco General Construction, Inc | 37 | 5 | 14% | +21% | +3.0% | $101.6M |
| Colacurcio Brothers, Inc. | 37 | 3 | 8% | +21% | +6.0% | $3.4M |
| CPM Development Corporation | 36 | 10 | 28% | +18% | +9.0% | $31.5M |
| Watson Asphalt Paving Company, | 36 | 6 | 17% | +17% | +8.0% | $8.7M |
| Guy F. Atkinson Construction, | 35 | 6 | 17% | +14% | +4.0% | $200.7M |
| Granite Northwest, Inc. DBA | 35 | 6 | 17% | +15% | +6.0% | $17.4M |
| Granite Northwest, Inc. | 35 | 12 | 34% | +9.0% | +4.0% | $19.7M |
| Marshbank Construction, Inc. | 34 | 7 | 21% | +16% | +8.0% | $14.6M |
| Superior Paving Co. | 34 | 22 | 65% | +9.0% | +7.0% | $33.8M |
| Trimaxx Construction, Inc. | 34 | 7 | 21% | +19% | +5.0% | $8.9M |
| Central Washington Asphalt, Inc. | 33 | 10 | 30% | +8.0% | +10% | $18.1M |
| Doolittle Construction, LLC | 33 | 13 | 39% | +15% | +10% | $24.5M |
| Thompson Bros. Excavating, Inc | 33 | 6 | 18% | +22% | +11% | $5.3M |
| Frank Gurney, Inc. | 32 | 13 | 41% | +12% | +11% | $10.5M |
| Selland Construction, Inc. | 31 | 9 | 29% | +16% | +12% | $25.9M |
| Cascade Bridge LLC | 31 | 2 | 6% | +11% | +1.0% | $23.0M |
| Colvico, Inc. | 31 | 12 | 39% | +15% | +15% | $9.0M |
| Woodworth & Company, Inc | 30 | 4 | 13% | +17% | +4.0% | $7.8M |
| Active Construction, Inc. | 30 | 5 | 17% | +24% | +13% | $3.5M |
| Construction Ahead, Inc. DBA | 29 | 10 | 34% | +21% | +22% | $6.6M |
| M.J. Hughes Construction, Inc. | 28 | 4 | 14% | +26% | +6.0% | $7.7M |
Lettings
Open any contract to read the full tabulation: every line, every bidder.
Latest WSDOT contracts in the data.
Sources and checks
Each price is copied from a bid tabulation the owner published after the letting. Nothing is estimated or averaged before it reaches this page.
| Owner | Lettings | Contracts | Bids | Prices | Check | How it was read |
|---|---|---|---|---|---|---|
| Texas DOT | 9 Jan 2020 to 19 Nov 2026 | 8,909 | 37,824 | 1,860,794 | Reconciled | TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out. |
| Ohio DOT | 23 Jan 2020 to 12 Nov 2026 | 4,408 | 15,816 | 1,093,243 | Reconciled | ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them. |
| Illinois DOT | 15 Jan 2021 to 18 Sep 2026 | 5,494 | 16,087 | 932,368 | Reconciled | IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total. |
| Florida DOT | 31 Jan 2018 to 28 Oct 2026 | 1,738 | 7,302 | 814,861 | Reconciled | FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out. |
| North Carolina DOT | 15 Jan 2013 to 20 Oct 2026 | 1,659 | 6,770 | 767,334 | Reconciled | NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out. |
| Virginia DOT | 29 Jan 2002 to 28 Oct 2026 | 7,628 | 18,240 | 674,864 | Reconciled | VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger. |
| Wisconsin DOT | 11 Jan 2022 to 10 Nov 2026 | 1,598 | 5,095 | 608,530 | Reconciled | WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out. |
| Indiana DOT | 12 Jan 2022 to 5 Nov 2026 | 2,082 | 7,109 | 552,581 | Reconciled | INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out. |
| Washington State DOT | 29 Dec 1999 to 7 Oct 2026 | 1,317 | 5,732 | 365,366 | Reconciled | WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept. |
| New York State DOT | 6 Jan 2022 to 15 Oct 2026 | 1,080 | 3,894 | 344,856 | Reconciled | NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped. |
| Kentucky Transportation Cabinet | 22 Nov 2019 to 22 Oct 2026 | 4,414 | 9,448 | 336,278 | Reconciled | KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out. |
| New Jersey DOT | 22 Jun 2017 to 16 Apr 2026 | 934 | 3,363 | 314,765 | Reconciled | NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price. |
| Missouri DOT | 17 Jan 2020 to 16 Oct 2026 | 1,896 | 5,865 | 293,103 | Reconciled | MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years. |
| South Carolina DOT | 11 Jan 2022 to 13 Oct 2026 | 1,037 | 3,257 | 175,917 | Reconciled | SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out. |
| Tennessee DOT | 9 Feb 2018 to 2 Oct 2026 | 1,257 | 3,169 | 156,766 | Reconciled | TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out. |
| Alabama DOT | 28 Jan 2022 to 28 Aug 2026 | 993 | 2,677 | 153,448 | Reconciled | ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total. |
| Oregon DOT | 7 Jan 2021 to 13 Aug 2026 | 394 | 1,571 | 131,407 | Not checkable | ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views. |
| Arkansas DOT | 12 Jan 2022 to 4 Nov 2026 | 1,118 | 2,578 | 80,673 | Reconciled | ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount. |
| Colorado DOT | 17 May 2023 to 10 Sep 2026 | 145 | 472 | 39,455 | Reconciled | CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out. |
| Iowa DOT | 19 Jan 2022 to 20 Oct 2026 | 112 | 415 | 12,634 | Reconciled | Iowa DOT bid tabulation PDFs: the letting of 19 January 2022 (read from the Internet Archive's copy of Iowa DOT's file) and lettings of August to October 2026. On A+B contracts the item total is kept and the time part dropped. Bids that did not match their published total are left out. |
| Caltrans | 25 Apr 2023 to 9 May 2023 | 33 | 95 | 4,418 | Reconciled | Caltrans bid summary PDFs; scanned pages read by OCR. Bids that did not match their published total are left out. |
How each bid was checked
For every bidder, quantity times unit price was summed over all lines of the contract and compared with the total bid printed by the owner. A bid is published only when the two match to within one dollar. The states marked not checkable or third party are explained in the table.
Read the numbers like an estimator
- Item codes and measurement rules are each owner's. Prices are compared inside one state and never pooled across states.
- Unit price moves with quantity, location and season. Set your quantity and region before you trust a median.
- Some bidders price a line at a cent and load the cost elsewhere. Those token prices, and bids more than three times the low bid, are left out of statistics by default and stay visible in tabulations.
- The low bidder's price on one line is not always the lowest price on that line. Orange marks the bidder who was low on the whole contract.
- Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.
The WSDOT pay items bid most often
| Pay item | Code | Unit | Low-bid median | Low bids | Window | Bids, all time |
|---|---|---|---|---|---|---|
| Erosion and sediment control lead | DAY | $100.00 | 1 | Last 24 months | 2,952 | |
| Paint line | LF | $0.78 | 4 | Last 24 months | 2,878 | |
| Construction signs class A | SF | $32.50 | 6 | Last 24 months | 2,787 | |
| Flexible guide post | EACH | $110.00 | 3 | Last 24 months | 2,759 | |
| Crushed surfacing base course | TON | $58.00 | 6 | Last 24 months | 2,701 | |
| Planing bituminous pavement | SY | $5.97 | 2 | Last 24 months | 2,440 | |
| Roadway excavation including haul | CY | $30.50 | 4 | Last 24 months | 2,290 | |
| Inlet protection | EACH | $122.50 | 2 | Last 24 months | 2,162 | |
| Plastic traffic arrow | EACH | $340.50 | 2 | Last 24 months | 2,001 | |
| High visibility fence | LF | $8.00 | 3 | Last 24 months | 1,810 | |
| Plastic drainage marking | EACH | $68.00 | 1 | Last 24 months | 1,773 | |
| Plastic stop line | LF | $72.00 | 1 | Last 24 months | 1,742 | |
| Removing guardrail | LF | $8.00 | 3 | Last 24 months | 1,653 | |
| Embankment compaction | CY | $16.00 | 3 | Last 24 months | 1,587 | |
| Raised pavement marker type 2 | HUND | $4,500.00 | 1 | Last 24 months | 1,551 | |
| Removing guardrail anchor | EACH | $365.00 | 2 | Last 24 months | 1,549 | |
| Clearing and grubbing | ACRE | $9,302.50 | 2 | Last 24 months | 1,521 | |
| Structure excavation class B including haul | CY | $14.75 | 3 | Last 24 months | 1,444 | |
| Sequential arrow sign | HR | $3.25 | 326 | All lettings | 1,427 | |
| Other traffic control labor | HR | $48.00 | 306 | All lettings | 1,400 | |
| Silt fence | LF | $4.50 | 235 | All lettings | 1,382 | |
| Shoring or extra excavation class B | SF | $0.57 | 2 | Last 24 months | 1,348 | |
| Recessed pavement marker | HUND | $1,182.50 | 310 | All lettings | 1,243 | |
| Temporary impact attenuator | EACH | $4,900.00 | 2 | Last 24 months | 1,214 | |
| Beam guardrail type 31 non-flared terminal | EACH | $5,200.00 | 2 | Last 24 months | 1,196 | |
| Extruded curb | LF | $18.00 | 1 | Last 24 months | 1,196 | |
| Seeding, fertilizing, and mulching | ACRE | $8,875.00 | 4 | Last 24 months | 1,187 | |
| Beam guardrail type 31 | LF | $45.00 | 2 | Last 24 months | 1,161 | |
| Plastic crosswalk line | SF | $13.50 | 1 | Last 24 months | 1,126 | |
| Street cleaning | HR | $200.00 | 1 | Last 24 months | 1,120 | |
| Pavement repair excavation including haul | SY | $37.50 | 2 | Last 24 months | 1,119 | |
| Hot mix asphalt class 1/2 inch PG 64-22 | TON | $79.00 | 213 | All lettings | 1,082 | |
| Portable changeable message sign | HR | $3.30 | 4 | Last 24 months | 1,072 | |
| Cement concrete sidewalk | SY | $99.00 | 1 | Last 24 months | 1,026 | |
| Removing paint line | LF | $0.75 | 195 | All lettings | 1,024 | |
| Plastic line | LF | $6.00 | 1 | Last 24 months | 1,020 | |
| Quarry spalls | TON | $74.00 | 1 | Last 24 months | 1,003 | |
| Plastic wide line | LF | $6.40 | 2 | Last 24 months | 920 | |
| Adjust catch basin | EACH | $425.00 | 224 | All lettings | 909 | |
| Temporary pavement marking-short duration | LF | $0.37 | 3 | Last 24 months | 907 | |
| Adjust monument case and cover | EACH | $300.00 | 243 | All lettings | 884 | |
| Check dam | LF | $28.00 | 1 | Last 24 months | 882 | |
| Cement concrete traffic curb and gutter | LF | $41.00 | 1 | Last 24 months | 878 | |
| Catch basin type 1 | EACH | $5,000.00 | 2 | Last 24 months | 871 | |
| Structure excavation class A including haul | CY | $30.00 | 1 | Last 24 months | 854 | |
| Training | HR | $3.00 | 175 | All lettings | 846 | |
| Adjust manhole | EACH | $500.00 | 211 | All lettings | 827 | |
| Testing storm sewer pipe | LF | $2.00 | 1 | Last 24 months | 825 | |
| Plugging existing pipe | EACH | $615.00 | 1 | Last 24 months | 823 | |
| Wattle | LF | $4.00 | 135 | All lettings | 805 | |
| Plastic traffic letter | EACH | $255.00 | 1 | Last 24 months | 775 | |
| Gravel backfill for drain | CY | $40.00 | 117 | All lettings | 762 | |
| Stabilized construction entrance | SY | $29.00 | 1 | Last 24 months | 761 | |
| Resetting impact attenuator | EACH | $2,800.00 | 1 | Last 24 months | 745 | |
| Plastic wide lane line | LF | $3.25 | 213 | All lettings | 734 | |
| Removing asphalt concrete pavement | SY | $8.00 | 126 | All lettings | 733 | |
| Centerline rumble strip | MI | $49,000 | 1 | Last 24 months | 720 | |
| Beam guardrail anchor type 10 | EACH | $900.00 | 142 | All lettings | 720 | |
| Cement concrete pedestrian curb | LF | $44.00 | 1 | Last 24 months | 704 | |
| Adjust valve box | EACH | $750.00 | 1 | Last 24 months | 690 | |
| Connection to drainage structure | EACH | $1,785.00 | 1 | Last 24 months | 685 | |
| Removing plastic line | LF | $1.00 | 161 | All lettings | 671 | |
| Construction geotextile for underground drainage | SY | $2.50 | 106 | All lettings | 665 | |
| Schedule A storm sewer pipe 12 inch diameter | LF | $147.50 | 2 | Last 24 months | 663 | |
| Commercial hot mix asphalt | TON | $150.00 | 134 | All lettings | 654 | |
| Raised pavement marker type 1 | HUND | $250.00 | 146 | All lettings | 653 | |
| Catch basin type 2 48 inch diameter | EACH | $7,500.00 | 1 | Last 24 months | 653 | |
| Underdrain pipe 6 inch diameter | LF | $12.00 | 94 | All lettings | 650 | |
| Gravel backfill for wall | CY | $31.00 | 91 | All lettings | 647 | |
| Gravel borrow including haul | TON | $15.25 | 100 | All lettings | 645 | |
| Barrier delineator | EACH | $16.40 | 155 | All lettings | 645 | |
| Grate inlet type 2 | EACH | $5,630.00 | 1 | Last 24 months | 645 | |
| Profiled plastic line | LF | $1.12 | 160 | All lettings | 637 | |
| Removing guide post | EACH | $7.12 | 136 | All lettings | 622 | |
| Asphalt for fog seal | TON | $650.00 | 209 | All lettings | 621 | |
| Schedule A culvert pipe 18 inch diameter | LF | $44.10 | 98 | All lettings | 611 | |
| Compost sock | LF | $8.00 | 117 | All lettings | 611 | |
| Removing drainage structure | EACH | $500.00 | 97 | All lettings | 563 | |
| Quarry spalls | CY | $71.75 | 4 | Last 24 months | 559 | |
| Raising existing beam guardrail | LF | $4.07 | 158 | All lettings | 551 | |
| Beam guardrail transition section type 21 | EACH | $8,850.00 | 2 | Last 24 months | 535 | |
| Bridge approach slab | SY | $600.00 | 1 | Last 24 months | 522 | |
| Concrete class 4000 for bridge | CY | $1,300.00 | 1 | Last 24 months | 513 | |
| Mailbox support type 1 | EACH | $300.00 | 89 | All lettings | 511 | |
| Ditch excavation including haul | CY | $14.45 | 1 | Last 24 months | 502 | |
| Common borrow including haul | CY | $24.50 | 2 | Last 24 months | 491 | |
| Construction geotextile for separation | SY | $2.00 | 83 | All lettings | 489 | |
| Removing raised pavement marker | HUND | $140.00 | 106 | All lettings | 487 | |
| Steel reinf. bar for bridge | LB | $2.00 | 1 | Last 24 months | 487 | |
| Construction geotextile for permanent erosion control | SY | $15.50 | 4 | Last 24 months | 484 | |
| Removing plastic traffic marking | EACH | $55.00 | 113 | All lettings | 481 | |
| Traffic barrier | LF | $440.00 | 1 | Last 24 months | 475 | |
| Schedule A culvert pipe 12 inch diameter | LF | $31.00 | 78 | All lettings | 473 | |
| Removing wire fence | LF | $6.50 | 1 | Last 24 months | 469 | |
| Removing and resetting beam guardrail | LF | $16.00 | 111 | All lettings | 456 | |
| Seeding and fertilizing by hand | SY | $2.50 | 1 | Last 24 months | 453 | |
| Painted drainage marking | EACH | $25.00 | 126 | All lettings | 450 | |
| Cement concrete traffic curb | LF | $30.00 | 96 | All lettings | 449 | |
| Removing and resetting existing permanent barrier | LF | $25.00 | 1 | Last 24 months | 444 | |
| Painted stop line | LF | $4.00 | 98 | All lettings | 442 | |
| End, gate, corner, and pull post for chain link fence | EACH | $222.50 | 70 | All lettings | 440 | |
| Shoulder finishing | MI | $2,500.00 | 1 | Last 24 months | 437 | |
| Schedule A storm sewer pipe 18 inch diameter | LF | $81.00 | 1 | Last 24 months | 433 | |
| Directional boring | LF | $170.00 | 1 | Last 24 months | 415 | |
| Hot mix asphalt sawcut and seal | LF | $30.00 | 123 | All lettings | 413 | |
| Removing cement concrete sidewalk | SY | $20.00 | 102 | All lettings | 409 | |
| Mailbox support type 2 | EACH | $441.50 | 68 | All lettings | 404 | |
| Painted wide line | LF | $0.40 | 85 | All lettings | 403 | |
| Detectable warning surface | SF | $31.00 | 1 | Last 24 months | 399 | |
| Streambed sediment | TON | $40.00 | 56 | All lettings | 390 | |
| Shoulder rumble strip type 1 | MI | $1,550.00 | 95 | All lettings | 389 | |
| Plastic junction box marking | EACH | $35.00 | 81 | All lettings | 389 | |
| Removing chain link fence | LF | $4.50 | 63 | All lettings | 380 | |
| Construction geotextile for soil stabilization | SY | $3.00 | 72 | All lettings | 374 | |
| Permanent impact attenuator | EACH | $27,000 | 79 | All lettings | 373 | |
| Longitudinal joint seal | LF | $4.75 | 95 | All lettings | 369 | |
| Seeding and mulching | ACRE | $5,000.00 | 65 | All lettings | 368 | |
| High visibility silt fence | LF | $4.40 | 2 | Last 24 months | 367 | |
| Sign covering | SF | $10.00 | 77 | All lettings | 363 | |
| Removing concrete barrier | LF | $8.00 | 77 | All lettings | 360 | |
| Compost blanket | SY | $4.00 | 52 | All lettings | 359 | |
| Select borrow including haul | TON | $14.00 | 58 | All lettings | 358 | |
| Wire fence type 2 | LF | $8.00 | 54 | All lettings | 356 | |
| Channel excavation including haul | CY | $21.23 | 2 | Last 24 months | 354 | |
| Chain link fence type 3 | LF | $17.00 | 56 | All lettings | 337 | |
| Catch basin type 1L | EACH | $1,200.00 | 53 | All lettings | 334 | |
| Conduit pipe 2 inch diameter | LF | $85.00 | 1 | Last 24 months | 331 | |
| Locking solid metal cover and frame for catch basin | EACH | $400.00 | 52 | All lettings | 324 | |
| Removing cement concrete curb and gutter | LF | $10.00 | 79 | All lettings | 323 | |
| Adjust junction box | EACH | $275.00 | 87 | All lettings | 318 | |
| Temporary barrier | LF | $39.00 | 2 | Last 24 months | 311 | |
| Adjust inlet | EACH | $1,111.00 | 1 | Last 24 months | 303 | |
| Steel reinf. bar for retaining wall | LB | $1.00 | 41 | All lettings | 299 | |
| Concrete class 4000 for retaining wall | CY | $575.00 | 41 | All lettings | 299 | |
| Transportable attenuator | EACH | $8,000.00 | 81 | All lettings | 298 | |
| No trespassing sign | EACH | $200.00 | 57 | All lettings | 298 | |
| Bark or wood chip mulch | SY | $5.70 | 1 | Last 24 months | 284 | |
| Drain pipe 6 inch diameter | LF | $20.50 | 44 | All lettings | 281 | |
| Beam guardrail type 31 - 8 FT. long post | LF | $24.00 | 48 | All lettings | 278 | |
| Removing cement concrete curb | LF | $10.00 | 70 | All lettings | 276 | |
| Temporary pavement marking-long duration | LF | $1.34 | 54 | All lettings | 269 | |
| Plastic aerial surveillance 1/2 marker | EACH | $150.00 | 78 | All lettings | 267 | |
| Schedule A culvert pipe 24 inch diameter | LF | $60.00 | 41 | All lettings | 266 | |
| Grooved plastic line | LF | $2.05 | 72 | All lettings | 265 | |
| Additional brooming | HR | $146.00 | 89 | All lettings | 262 | |
| Cement concrete pavement | CY | $620.00 | 1 | Last 24 months | 262 | |
| Flaggers | HR | $61.00 | 74 | All lettings | 259 | |
| Hot mix asphalt class 1/2 inch PG 58H-22 | TON | $192.00 | 1 | Last 24 months | 257 | |
| Plastic aerial surveillance full marker | EACH | $150.00 | 78 | All lettings | 254 | |
| Bark or wood chip mulch | ACRE | $25,000 | 41 | All lettings | 251 |
Every other WSDOT pay item with a page
17 more pay items, by item code. Any item without a page is in the explorer above.
- Beam guardrail block
- Beam guardrail type thrie beam
- Cement concrete curb ramp type parallel A
- Cement concrete curb ramp type parallel B
- Cement concrete pavement grinding
- Controlled density fill
- Crushed surfacing base course
- Drop inlet type 1
- Joint adhesive for bituminous pavement
- Painted crosswalk line
- Painted wide lane line
- Plastic bicycle lane symbol
- Plastic crosshatch marking
- Plastic railroad crossing symbol
- Precast dual faced sloped mountable curb
- Removing asphalt concrete curb
- Removing plastic crosswalk line
Who bids on WSDOT work
| Bidder | Bids | Low bids | Win rate |
|---|---|---|---|
| Granite Construction Company | 267 | 60 | 22% |
| Lakeside Industries, Inc. | 164 | 60 | 37% |
| Wilder Construction Company | 120 | 25 | 21% |
| Scarsella Bros., Inc. | 115 | 30 | 26% |
| Tri-State Construction, Inc. | 94 | 30 | 32% |
| Interwest Construction, Inc. | 81 | 23 | 28% |
| C.A. Carey Corporation | 79 | 7 | 9% |
| Quigg Bros., Inc. | 78 | 12 | 15% |
| Tucci & Sons, Inc. | 75 | 33 | 44% |
| Mowat Construction Company | 74 | 20 | 27% |
63 firms have a page with their full record: all WSDOT bidders.
Latest lettings
| Let | Contract | Region | Project | Bids | Low bid | Low bidder | Source |
|---|---|---|---|---|---|---|---|
| 07 OCT 2026 | XE3773 | OR region | Sr 20 Us 101 I/S To N Of Fairmount Rd Hfst | 6 | $355,249 | Lakeside Industries, Inc. | WSDOT |
| 07 OCT 2026 | XE3770 | NCR region | Sr 28 Ewc 2026 Demo No 3 | 3 | $45,557 | Skycorp, LTD | WSDOT |
| 23 SEP 2026 | XE3772 | SCR region | Sr 906 Hyak Vicinity Emergency Washout Restoration | 8 | $1,242,940 | Scarsella Bros., Inc. | WSDOT |
| 26 AUG 2026 | XE3764 | SCR region | Us 12 Locust Ln Vicinity Emergency Washout Repair | 7 | $329,923 | Interwest Construction, Inc. | WSDOT |
| 26 AUG 2026 | XE3762 | WSF region | Sr 104 Bremerton Trm Slip 1 Vts Tower Preservation | 2 | $140,982 | Associated Underwater Services Inc. | WSDOT |
| 12 AUG 2026 | XE3760 | SCR region | I-90 Eb 3 Miles E Of North Bend - Emergency Seeding And Erosion Control | 5 | $233,938 | Scarsella Bros., Inc. | WSDOT |
| 15 JUL 2026 | XE3755 | SCR region | Us 12 Eschbach Rd & Ackley Rd/Clover Ln - I/S Safety Improvements | 5 | $1,717,172 | Interwest Construction, Inc. | WSDOT |
| 08 JUL 2026 | XE3751 | SCR region | Us 395 Kartchner St I/C Nb Ramp Terminal Improvements | 4 | $1,093,111 | Tapani, Inc. | WSDOT |
| 01 JUL 2026 | XE3749 | SCR region | Sr 240 Beloit Road To Hagen Rd Pavement Repairs | 3 | $400,000 | Central Washington Asphalt, Inc. | WSDOT |
| 01 JUL 2026 | XE3756 | SCR region | I-90 Hansen Rd Overpass Emergency Bridge Replacement | 6 | $5,406,051 | N.A. Degerstrom, Inc. | WSDOT |
| 19 APR 2023 | 009952 | SCR region | Us 97 jones rd - intersection improvements | 4 | $3,896,214 | Interstate Concrete & Asphalt | WSDOT |
| 12 APR 2023 | 009945 | SCR region | Sr 241 mabton vicinity retrofit bridges | 3 | $18,224,953 | Kraemer North America, LLC. | WSDOT |
Every WSDOT letting since 2022, contract by contract: WSDOT letting results.
WSDOT projects on the infrastructure map
Large Washington State DOT projects described on our infrastructure map, each with its owner's own sources:
Where these numbers come from
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
| Year | Contracts |
|---|---|
| 1999 | 1 |
| 2000 | 36 |
| 2001 | 66 |
| 2002 | 42 |
| 2003 | 59 |
| 2004 | 54 |
| 2005 | 56 |
| 2006 | 52 |
| 2007 | 57 |
| 2008 | 53 |
| 2009 | 56 |
| 2010 | 74 |
| 2011 | 65 |
| 2012 | 48 |
| 2013 | 65 |
| 2014 | 36 |
| 2015 | 53 |
| 2016 | 61 |
| 2017 | 79 |
| 2018 | 68 |
| 2019 | 63 |
| 2020 | 34 |
| 2021 | 50 |
| 2022 | 43 |
| 2023 | 36 |
| 2026 | 10 |
Every state's coverage and check is on the bid results hub.
Other states: Alabama, Arkansas, California, Colorado, Florida, Illinois, Indiana, Iowa, Kentucky, Missouri, New Jersey, New York, North Carolina, Ohio, Oregon, South Carolina, Tennessee, Texas, Virginia, Wisconsin.
Your own bid history, read the same way