ODOT unit bid prices and bid tabulations

Unit prices bid on 4,408 Ohio DOT contracts let from 23 JAN 2020 to 12 NOV 2026, read from ODOT's own tabulations. 856 pay items have enough recent bids for a page of their own; every item is in the explorer.

Contracts
4,408
Bids
15,816
Unit prices
1,093,243

Data through 12 NOV 2026, the latest ODOT letting read. Compiled by Mirage Metrics.

Price a ODOT pay item

Pay items bid most often in Ohio

Pay itemCodeUnitLow-bid medianLow bids
Erosion control832E30000EACH$1.00963
Commercial fertilizer659E20000TON$1,000.00610
Water659E35000MGAL$1.00614
Law enforcement officer with patrol car for assistance614E11110HR$95.00691
Excavation203E10000CY$32.00573
Lime659E31000ACRE$154.00513
Seeding and mulching659E10000SY$2.95511
Aggregate base304E20000CY$100.00553
Embankment203E20000CY$29.94516
Subgrade compaction204E10000SY$3.00507
Non-tracking tack coat407E20000GAL$3.50562
Raised pavement marker removed621E54000EACH$10.25518

Check my bid

Add the lines you are pricing, with your quantity and unit price. Each line is placed against what bidders carried in the last 24 months, at a similar quantity when enough bids exist. Your numbers stay in this browser.

Columns: item code, quantity, unit price, with or without a header row.

Competitors

Who bids, how often they are low, how far off they are when they lose, and how much they leave on the table when they win.

Sort by: most bids counts every bid a firm submitted; most low bids counts the contracts where it was the low bidder; win rate is low bids divided by bids, for firms with five bids or more; low bid volume adds up its low bids in dollars. Gap when not low is the average distance from its total to the low bid; left on table is the average distance from its low bid to the second bid.

460 firms in Ohio, the 50 with the most bids shown.

BidderBidsLow bidsWin rateGap when not lowLeft on tableLow bid volume
Shelly & Sands Inc119445838%+15%+10%$2.1B
Shelly Company78334144%+15%+9.0%$969.7M
Complete General Construction Company66211317%+20%+10%$362.6M
Kokosing Construction Company Inc46515333%+15%+8.0%$1.2B
Eclipse Co LLC4224310%+33%+11%$36.5M
Alan Stone Co Inc4108521%+23%+7.0%$95.9M
Karvo Companies Inc4017719%+14%+8.0%$342.8M
Axis Civil Construction LLC3498524%+21%+12%$60.1M
John R Jurgensen Company34510731%+25%+13%$834.0M
Sunesis Construction Co3113812%+26%+12%$126.2M
Ohio-West Virginia Excavating Co2857326%+26%+12%$47.2M
Barrett Paving Materials Inc2599637%+15%+12%$337.1M
Lake Erie Construction Company21011454%+16%+10%$128.3M
Eagle Bridge Co2015628%+13%+9.0%$244.9M
Perram Electric Inc1926936%+14%+15%$44.7M
D G M Inc1894323%+18%+9.0%$49.7M
Ruhlin Company1894825%+20%+17%$136.1M
R C Construction Company and Son Inc180158%+45%+6.0%$10.4M
BCC Ohio Inc1728851%+16%+25%$56.0M
Great Lakes Construction Co1664728%+18%+13%$491.7M
NLS Paving, Inc1602918%+17%+11%$61.9M
Miller Cable Company1542818%+20%+7.0%$19.4M
Miller Bros Const Inc1483926%+14%+7.0%$182.2M
A & A Safety Inc1463927%+20%+9.0%$39.6M
Oglesby Construction Inc1373526%+19%+9.0%$72.4M
George J Igel & Co Inc1321310%+16%+6.0%$25.3M
Fillmore Construction1314232%+22%+13%$49.9M
Ronyak Paving Inc1315038%+11%+8.0%$85.6M
Chagrin Valley Paving Inc1292217%+18%+8.0%$43.4M
Allard Excavation LLC1273931%+21%+10%$63.7M
M P Dory Co1273931%+19%+11%$41.8M
Barbicas Construction Company Inc125119%+23%+7.0%$11.2M
Gerken Paving Inc1244839%+10%+6.0%$194.8M
Strawser Construction Inc1204134%+22%+12%$66.9M
The Aero-Mark Company LLC1195647%+14%+12%$100.9M
Perk Company Inc1172017%+25%+14%$53.3M
Double Z Construction Company1171614%+16%+10%$23.0M
Vernon Nagel Inc1153430%+15%+7.0%$88.2M
S E T Inc11576%+33%+10%$6.0M
Stanley Miller Construction Company951920%+37%+12%$12.2M
Prus Construction Company891618%+20%+12%$48.1M
Buds Inc893034%+17%+10%$26.3M
Marucci & Gaffney Excavating Co853136%+22%+10%$98.9M
Brumbaugh Construction Inc802734%+12%+7.0%$39.4M
Rietschlin Construction Inc7968%+17%+17%$12.8M
Great Lakes Demolition Company764053%+12%+15%$67.9M
Madex Construction Co73710%+44%+15%$7.5M
Beaver Excavating Company721014%+25%+9.0%$39.5M
Catts Construction Inc711825%+20%+9.0%$30.8M
Black Horse Bridge Construction Inc712434%+16%+8.0%$31.4M

Lettings

Open any contract to read the full tabulation: every line, every bidder.

Latest ODOT contracts in the data.

Sources and checks

Each price is copied from a bid tabulation the owner published after the letting. Nothing is estimated or averaged before it reaches this page.

OwnerLettingsContractsBidsPricesCheckHow it was read
Texas DOT9 Jan 2020 to 19 Nov 20268,90937,8241,860,794ReconciledTxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Ohio DOT23 Jan 2020 to 12 Nov 20264,40815,8161,093,243ReconciledODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Illinois DOT15 Jan 2021 to 18 Sep 20265,49416,087932,368ReconciledIDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Florida DOT31 Jan 2018 to 28 Oct 20261,7387,302814,861ReconciledFDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
North Carolina DOT15 Jan 2013 to 20 Oct 20261,6596,770767,334ReconciledNCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Virginia DOT29 Jan 2002 to 28 Oct 20267,62818,240674,864ReconciledVDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Wisconsin DOT11 Jan 2022 to 10 Nov 20261,5985,095608,530ReconciledWisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Indiana DOT12 Jan 2022 to 5 Nov 20262,0827,109552,581ReconciledINDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Washington State DOT29 Dec 1999 to 7 Oct 20261,3175,732365,366ReconciledWSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
New York State DOT6 Jan 2022 to 15 Oct 20261,0803,894344,856ReconciledNYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Kentucky Transportation Cabinet22 Nov 2019 to 22 Oct 20264,4149,448336,278ReconciledKYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
New Jersey DOT22 Jun 2017 to 16 Apr 20269343,363314,765ReconciledNJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
Missouri DOT17 Jan 2020 to 16 Oct 20261,8965,865293,103ReconciledMoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
South Carolina DOT11 Jan 2022 to 13 Oct 20261,0373,257175,917ReconciledSCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Tennessee DOT9 Feb 2018 to 2 Oct 20261,2573,169156,766ReconciledTDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Alabama DOT28 Jan 2022 to 28 Aug 20269932,677153,448ReconciledALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Oregon DOT7 Jan 2021 to 13 Aug 20263941,571131,407Not checkableODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Arkansas DOT12 Jan 2022 to 4 Nov 20261,1182,57880,673ReconciledARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Colorado DOT17 May 2023 to 10 Sep 202614547239,455ReconciledCDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.
Iowa DOT19 Jan 2022 to 20 Oct 202611241512,634ReconciledIowa DOT bid tabulation PDFs: the letting of 19 January 2022 (read from the Internet Archive's copy of Iowa DOT's file) and lettings of August to October 2026. On A+B contracts the item total is kept and the time part dropped. Bids that did not match their published total are left out.
Caltrans25 Apr 2023 to 9 May 202333954,418ReconciledCaltrans bid summary PDFs; scanned pages read by OCR. Bids that did not match their published total are left out.

How each bid was checked

For every bidder, quantity times unit price was summed over all lines of the contract and compared with the total bid printed by the owner. A bid is published only when the two match to within one dollar. The states marked not checkable or third party are explained in the table.

Read the numbers like an estimator

  • Item codes and measurement rules are each owner's. Prices are compared inside one state and never pooled across states.
  • Unit price moves with quantity, location and season. Set your quantity and region before you trust a median.
  • Some bidders price a line at a cent and load the cost elsewhere. Those token prices, and bids more than three times the low bid, are left out of statistics by default and stay visible in tabulations.
  • The low bidder's price on one line is not always the lowest price on that line. Orange marks the bidder who was low on the whole contract.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

The ODOT pay items bid most often

Pay itemCodeUnitLow-bid medianLow bidsWindowBids, all time
Erosion control832E30000EACH$1.00963Last 24 months13,386
Commercial fertilizer659E20000TON$1,000.00610Last 24 months9,391
Water659E35000MGAL$1.00614Last 24 months9,355
Law enforcement officer with patrol car for assistance614E11110HR$95.00691Last 24 months8,650
Excavation203E10000CY$32.00573Last 24 months8,485
Lime659E31000ACRE$154.00513Last 24 months8,071
Seeding and mulching659E10000SY$2.95511Last 24 months8,051
Aggregate base304E20000CY$100.00553Last 24 months8,014
Embankment203E20000CY$29.94516Last 24 months7,986
Subgrade compaction204E10000SY$3.00507Last 24 months7,645
Non-tracking tack coat407E20000GAL$3.50562Last 24 months7,230
Raised pavement marker removed621E54000EACH$10.25518Last 24 months6,945
RPM621E00100EACH$42.00515Last 24 months6,617
Topsoil659E00300CY$50.00475Last 24 months6,213
Pavement removed202E23000SY$18.00473Last 24 months6,191
Sealing of concrete surfaces (epoxy-urethane)512E10100SY$40.00453Last 24 months6,014
Removal of ground mounted post support and disposal630E86002EACH$25.00323Last 24 months5,981
Guardrail removed202E38000FT$3.00408Last 24 months5,852
Sign, flat sheet630E80100SF$25.00409Last 24 months5,830
Repair seeding and mulching659E14000SY$1.50418Last 24 months5,777
Removal of ground mounted sign and disposal630E84900EACH$20.00310Last 24 months5,322
Portable changeable message sign, as per plan614E18601SNMT$995.00433Last 24 months5,023
Center line, type 1642E00300MI$1,545.00329Last 24 months4,686
Tack coat407E10000GAL$3.50262Last 24 months4,619
Guardrail, type MGS606E15050FT$22.77340Last 24 months4,533
Edge line, 6", type 1642E00104MI$1,200.00312Last 24 months4,463
Ground mounted support, no. 3 post630E03100FT$17.50292Last 24 months4,184
Porous backfill with geotextile fabric518E21200CY$140.00257Last 24 months3,919
Water616E10000MGAL$55.00247Last 24 months3,897
Asphalt concrete for maintaining traffic614E13000CY$275.00258Last 24 months3,863
Portable barrier, unanchored622E41100FT$26.00248Last 24 months3,768
Concrete masonry602E20000CY$2,596.97250Last 24 months3,703
Field office, type B619E16010MNTH$2,300.00263Last 24 months3,694
Soil analysis test659E00100EACH$133.00273Last 24 months3,588
1" preformed expansion joint filler516E13600SF$12.00213Last 24 months3,486
Ground mounted support, no. 2 post630E02100FT$15.90160Last 24 months3,471
Asphalt concrete surface course, type 1, (448), PG64-22441E50000CY$296.5092Last 24 months3,381
Asphalt concrete base, PG64-22, (449)301E56000CY$285.00406Last 24 months3,366
Removal of ground mounted sign and reerection630E85100EACH$85.00237Last 24 months3,345
Anchor assembly, MGS type T606E26550EACH$1,360.00268Last 24 months3,313
Work zone center line, class III, 642 paint614E21550MI$1,050.00268Last 24 months3,288
Proof rolling204E45000HR$250.00246Last 24 months3,132
Inter-seeding659E15000SY$1.00258Last 24 months3,100
Stop line644E00500FT$9.00315Last 24 months3,087
Pipe removed, 24" and under202E35100FT$19.00689All lettings3,038
Ground rod625E32000EACH$300.00228Last 24 months3,027
Center line646E10200MI$10,334233Last 24 months3,002
Edge line, 6"646E10010MI$9,000.00222Last 24 months2,969
Compacted aggregate617E10100CY$110.00246Last 24 months2,949
Wearing course removed202E23500SY$10.00199Last 24 months2,931
Asphalt concrete base, PG64-22301E46000CY$220.00577All lettings2,868
Type 2 waterproofing512E33000SY$40.00197Last 24 months2,859
Walk removed202E30000SF$4.50246Last 24 months2,858
Aggregate drains605E31100FT$21.00174Last 24 months2,849
Curb removed202E32000FT$11.00231Last 24 months2,848
Patching concrete structure, as per plan519E11101SF$185.00216Last 24 months2,806
Work zone stop line, class III, 642 paint614E26610FT$3.60260Last 24 months2,770
Precast reinforced concrete outlet611E99710EACH$427.00184Last 24 months2,754
Treating concrete bridge decks with gravity fed resin512E73500SY$12.00242Last 24 months2,738
Work zone marking sign614E12460EACH$92.00253Last 24 months2,733
6" perforated corrugated plastic pipe518E40000FT$12.00179Last 24 months2,656
Field painting structural steel, intermediate coat514E00060SF$4.72122Last 24 months2,547
Epoxy coated steel reinforcement509E10000LB$1.70584All lettings2,509
Curb, type 6609E26000FT$41.00188Last 24 months2,441
Catch basin removed202E58100EACH$500.00175Last 24 months2,401
Fence removed202E75000FT$5.00147Last 24 months2,380
Work zone edge line, class III, 6", 642 paint614E22360MI$810.50214Last 24 months2,374
Final inspection repair514E10000EACH$200.00104Last 24 months2,370
Center line644E00300MI$7,390.00205Last 24 months2,365
Grinding fins, tears, slivers on existing structural steel514E00504MNHR$150.00107Last 24 months2,362
Surface preparation of existing structural steel514E00050SF$14.00102Last 24 months2,314
Field painting of existing structural steel, prime coat514E00056SF$4.80105Last 24 months2,294
Asphalt concrete surface course, type 1, (449), PG64-22441E70000CY$375.40277Last 24 months2,277
4" concrete walk608E10000SF$15.00171Last 24 months2,257
Excavation of subgrade204E13000CY$30.00165Last 24 months2,208
Curb ramp608E52000SF$25.00173Last 24 months2,173
Sign post reflector630E08600EACH$46.63172Last 24 months2,168
Field painting structural steel, finish coat514E00066SF$3.75114Last 24 months2,154
Epoxy coated steel reinforcement509E10000LB$2.00310Last 24 months2,145
Object marker, two way614E13360EACH$21.75117Last 24 months2,144
Lane arrow644E01300EACH$120.00183Last 24 months2,084
Object marker, one way614E13350EACH$20.00143Last 24 months2,078
Geotextile fabric204E50000SY$2.27166Last 24 months2,025
MGS bridge terminal assembly, type 1606E35002EACH$2,550.00152Last 24 months2,022
Manhole adjusted to grade611E99654EACH$1,100.00203Last 24 months1,997
6" non-perforated corrugated plastic pipe, including specials518E40010FT$20.00130Last 24 months1,928
6" conduit, type F for underdrain outlets611E00510FT$30.00145Last 24 months1,911
Approach slab removed202E22900SY$52.00127Last 24 months1,902
Rock channel protection, type C with filter601E32200CY$220.00121Last 24 months1,865
Guardrail, type MGS with long posts606E15100FT$25.00152Last 24 months1,853
Prime coat, as per plan408E10001GAL$5.00122Last 24 months1,812
Edge line, 6"644E00104MI$5,175.00142Last 24 months1,794
Pavement repair253E02000CY$402.50162Last 24 months1,766
Work zone impact attenuator, 24" wide hazards, (bidirectional)614E12384EACH$2,352.94110Last 24 months1,765
Stop line646E10400FT$12.50148Last 24 months1,761
Transverse/diagonal line644E00700FT$8.00159Last 24 months1,758
Tied concrete block mat with type 1 underlayment601E21050SY$157.50158Last 24 months1,751
Asphalt concrete intermediate course, type 2, (448)441E50300CY$220.0041Last 24 months1,747
Class QC1 concrete, footing511E46510CY$800.00103Last 24 months1,742
Work zone impact attenuator, 24" wide hazards, (unidirectional)614E12380EACH$2,300.00153Last 24 months1,732
Work zone center line, class I, 642 paint614E21100MI$1,382.50142Last 24 months1,725
Trench625E29000FT$13.86119Last 24 months1,718
12" conduit, type B611E04400FT$102.95126Last 24 months1,709
Removal of existing coatings from concrete surfaces512E74000SY$30.00188Last 24 months1,700
Full depth pavement sawing252E01500FT$4.0096Last 24 months1,681
Manhole, no. 3611E99574EACH$5,600.00133Last 24 months1,674
Headwall removed202E20010EACH$540.00111Last 24 months1,655
Valve box adjusted to grade638E10800EACH$500.00160Last 24 months1,646
Sealing of concrete surfaces (non-epoxy)512E10050SY$15.00113Last 24 months1,620
Pull box, 725.08, 18"625E30700EACH$1,250.00129Last 24 months1,620
12" conduit, type C611E04600FT$100.00122Last 24 months1,616
Work zone stop line, class I614E26000FT$4.00109Last 24 months1,613
Sign, flat sheet630E80100SF$30.0035Last 24 months1,597
Special - steel drip strip518E22300FT$20.00125Last 24 months1,569
Dowel holes with nonshrink, nonmetallic grout510E10000EACH$32.00106Last 24 months1,563
6" conduit, type F611E01500FT$25.00103Last 24 months1,548
Catch basin, no. 2-2B611E98470EACH$2,800.00116Last 24 months1,538
Pull box, 725.08, 24"625E30706EACH$1,500.0099Last 24 months1,537
Catch basin adjusted to grade611E98630EACH$1,125.00144Last 24 months1,535
Rock channel protection, type B with filter601E32100CY$150.00101Last 24 months1,506
Work zone stop line, class I, 642 paint614E26200FT$4.00104Last 24 months1,500
2" preformed expansion joint filler516E13900SF$12.00120Last 24 months1,468
Field office, type A619E16000MNTH$1,800.0052Last 24 months1,460
Compacted aggregate, as per plan617E10101CY$98.27109Last 24 months1,436
Asphalt concrete surface course, type 1, (448), as per plan441E50101CY$215.0035Last 24 months1,427
Connection, fused pull apart625E00450EACH$150.00109Last 24 months1,423
Lane arrow646E20300EACH$169.00123Last 24 months1,368
Work zone lane line, class III, 6", 642 paint614E20560MI$650.00146Last 24 months1,358
Anchor assembly, MGS type E (MASH 2016)606E26150EACH$2,584.12108Last 24 months1,356
Work zone center line, class I614E21000MI$1,225.00102Last 24 months1,320
Channelizing line, 8"644E00400FT$2.3096Last 24 months1,311
Catch basin, no. 3A611E98180EACH$4,138.5897Last 24 months1,306
Work zone edge line, class I, 6", 642 paint614E22110MI$1,175.00113Last 24 months1,297
Work zone channelizing line, class III, 8", 642 paint614E23680FT$0.80103Last 24 months1,294
Connection, unfused permanent625E00480EACH$132.50104Last 24 months1,286
Granular material, type B204E30010CY$70.0094Last 24 months1,284
No. 10 AWG pole and bracket cable625E23400FT$2.0096Last 24 months1,270
Underground warning marking tape625E36010FT$2.0066Last 24 months1,255
Lane line, 6", type 1642E00204MI$700.0094Last 24 months1,243
Digital speed limit (DSL) sign assembly808E18700SNMT$700.00127Last 24 months1,235
Unclassified excavation503E21100CY$102.1696Last 24 months1,232
Increased barrier delineation614E11630FT$1.9894Last 24 months1,231
Barrier reflector, type 2 (bidirectional)626E00110EACH$13.0068Last 24 months1,224
Pipe removed, 24" and under202E35100FT$25.00302Last 24 months1,222
Embankment, as per plan203E20001CY$54.6596Last 24 months1,218
Semi-integral abutment expansion joint seal516E14020FT$45.0086Last 24 months1,210
Asphalt concrete intermediate course, type 2, (449)441E70300CY$314.00143Last 24 months1,204
Slope erosion protection670E00500SY$2.00108Last 24 months1,202
Pipe removed, over 24" diameter202E35200FT$35.79256All lettings1,190
15" conduit, type B611E05900FT$118.5082Last 24 months1,179
Low bidder's median unit price per pay item, Ohio

Every other ODOT pay item with a page

706 more pay items, by item code. Any item without a page is in the explorer above.

The ODOT market in the last three months

Computed from the bids in the data for 12 AUG 2026 to 12 NOV 2026, against the same three months a year earlier. A contract is counted once, at its letting date.

Last three monthsSame months a year earlier
Contracts let164141
Letting dates86
Low bids, total$662,416,295$348,296,897
Median bidders per contract33
Median low bid against the engineer's estimate-3.0% (164 contracts)-4.0% (140 contracts)
Low bid under the estimate101 of 16482 of 140
ODOT lettings, 12 AUG 2026 to 12 NOV 2026 against 12 AUG 2025 to 12 NOV 2025

Pay items whose low-bid median moved most between the last six months and the twelve before (192 items had at least fifteen low bids in each window). Quantity mix and location move these medians as much as the market does.

Pay itemCodeUnitLast 6 months12 months beforeChangeLow bids
Structural steel members, level UF, as per plan513E10201LB$40.00$25.00+60%19 / 33
Catch basin removed202E58100EACH$762.00$482.00+58%32 / 80
6" perforated corrugated plastic pipe518E40000FT$19.00$12.00+58%25 / 78
Full depth pavement sawing255E20000FT$5.33$3.70+44%18 / 45
Work zone stop line, class I614E26000FT$5.00$3.50+43%22 / 59
Removal of existing pavement marking512E74500FT$1.00$4.00-75%75 / 55
Field painting of damaged structural steel, as per plan514E20001SF$115.00$262.50-56%15 / 22
Repair seeding and mulching659E14000SY$1.10$1.94-43%73 / 212
Rock channel protection, type C with geotextile fabric601E32204CY$125.00$190.00-34%15 / 36
Trench, 24" deep625E29002FT$8.00$11.53-31%15 / 24
ODOT pay items moving most, low bidder's median, last six months against the twelve before

Who bids on ODOT work

ODOT bidders with the most bids in the data

202 firms have a page with their full record: all ODOT bidders.

Latest lettings

LetContractCountyProjectBidsLow bidLow bidderSource
12 NOV 2026260459FULFUL-US 20A-19.20 Slide Repair (SLIDE REPAIR)5$1,265,940Toledo Caisson CorporationODOT
12 NOV 2026260489ASDASD-IR 71-00.00 (FOUR LANE RESURFACING)2$12,774,168Shelly & Sands IncODOT
12 NOV 2026260490ATHATH-US 50-01.77 (FOUR LANE RESURFACING)1$8,350,586Shelly & Sands IncODOT
12 NOV 2026260491BELBEL-SR 7-25.27 (SLIDE REPAIR)8$844,260Saorsa Construction Ohio, Inc.ODOT
12 NOV 2026260492CLACLA-LMT Culvert Replacement (CULVERT REPLACEMENT)3$197,783Fillmore ConstructionODOT
12 NOV 2026260493CLICLI-US 68-09.42 (CULVERT REPLACEMENT)5$239,218Sunesis Construction CoODOT
12 NOV 2026260495COLCOL-SR 9-15.244 (SIGNALIZATION)3$108,791Cornerstone Electric IncODOT
12 NOV 2026260497District 1D01-OL FY27 (BRIDGE REPAIR)4$1,242,291BCC Ohio IncODOT
12 NOV 2026260499DELDEL-/UNI-SIGN-FY2027 (SIGNING)3$413,173Cleveland Barricading Systems LLCODOT
12 NOV 2026260501GEAGEA-SR 87-03.18 Replace (BRIDGE REPLACEMENT (1 BRIDGE))4$2,236,334J D Williamson Construction Co IncODOT
12 NOV 2026260502HAMHAM-IR 275-05.25 (SLIDE REPAIR)4$1,018,980Alan Stone Co IncODOT
12 NOV 2026260504KNOKNO-US 62-00.00 (TWO LANE RESURFACING)2$4,851,899Kokosing Construction Company IncODOT
Latest ODOT contracts in the data

Every ODOT letting since 2022, contract by contract: ODOT letting results.

ODOT projects on the infrastructure map

Large Ohio DOT projects described on our infrastructure map, each with its owner's own sources:

Where these numbers come from

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

YearContracts
2020701
2021706
2022669
2023609
2024599
2025609
2026515
ODOT contracts in the data, by year of letting

Every state's coverage and check is on the bid results hub.

Other states: Alabama, Arkansas, California, Colorado, Florida, Illinois, Indiana, Iowa, Kentucky, Missouri, New Jersey, New York, North Carolina, Oregon, South Carolina, Tennessee, Texas, Virginia, Washington, Wisconsin.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy